Case studies / portfolio section #7

Open
opened 2026-05-05 12:04:12 +00:00 by frank · 0 comments
Owner

Build dedicated case-study pages for each shipped product, going deeper than the homepage Field Notes blurbs.

Scope per case study:

  • Problem / context (what existed before, why it was inadequate)
  • Approach and key technical decisions (stack choices, tradeoffs)
  • Screenshots (more than the single hero shot on the homepage)
  • Outcomes / metrics where available (users, performance, cost savings, etc.)
  • Tech stack callout
  • Live link

Initial pages:

  • /work/cookslate — Cookslate (recipe manager)
  • /work/fleetwright — FleetWright (fleet repair tracker)
  • /work/architect-console — Architect Console (internal tooling — case study angle: building the studio''s own systems)

Routing:

  • Update masthead Work link to /work or anchor to first case study
  • Each page reuses the editorial design system (bone bg, mono chrome, hairline rules)

Future:

  • New case studies added as new client work ships.
Build dedicated case-study pages for each shipped product, going deeper than the homepage Field Notes blurbs. **Scope per case study:** - Problem / context (what existed before, why it was inadequate) - Approach and key technical decisions (stack choices, tradeoffs) - Screenshots (more than the single hero shot on the homepage) - Outcomes / metrics where available (users, performance, cost savings, etc.) - Tech stack callout - Live link **Initial pages:** - /work/cookslate — Cookslate (recipe manager) - /work/fleetwright — FleetWright (fleet repair tracker) - /work/architect-console — Architect Console (internal tooling — case study angle: building the studio''s own systems) **Routing:** - Update masthead Work link to /work or anchor to first case study - Each page reuses the editorial design system (bone bg, mono chrome, hairline rules) **Future:** - New case studies added as new client work ships.
frank added this to the Backlog milestone 2026-05-05 12:04:12 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
frank/fmr-digital#7
No description provided.